![]() |
||||||||||||||||||||||||
![]() |
![]() |
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||||
|
Since May 2008 all new homes are required to have a Code level rating registered
with Building Control. This is sometimes required before Planning Permission is
granted. The Code aims to protect the environment by providing guidance on the
construction of high performance homes built with sustainability in mind.
In normal circumstances an Architectural Practice will design a house before the
completed drawings are sent away to a third party to undertake the Code
Assessment. If the house fails to meet itís target code rating, the design will need to
be altered and reassessed, which could cost additional time and money to clients.
However at hpa, our ‘in house’ accredited assessment team can regularly monitor
and alter our designs as they develop. This allows us to design buildings with
confidence that they can reach a target code level. This one stop approach will
undoubtedly bring benefits to our clients in terms of time, cost and continuity.
|
We can offer:
Please do not hesitate to get in touch to discuss any
element of this service in more detail, or if you would like us to provide a quotation
for your project.
|

